Inspection well connecting pipe installation
1. The sequence of connection and installation of manhole base and pipeline shall start from the upstream section of the connecting pipe, and be installed in the sequence of well pipe well pipe, and gradually extend to the downstream branch pipe and main pipe.
2. The construction method of well seat joint and pipeline connection shall be consistent with that of pipeline connection of the same type of joint.
3. The connection of well seat and inlet pipe and discharge pipe needs to be changed. When reducing joint is used, when the inlet pipe diameter is smaller than the well seat interface pipe diameter, the top of the pipe shall be flat connected; when the well seat outlet pipe interface is larger than the downstream pipe, the bottom of the pipe shall be flat connected.
4. When the pipe adopts variable angle joint or spherical joint to adjust the slope, when the pipe diameter is 315mm, special tools shall be used instead of chain spanner.
5. For the installation of additional joints, special tools shall be used to open holes on the shaft wall according to the shaft size and the diameter of connecting pipes. The peripheral edge of holes shall be flat, and the installation of additional joints shall not be sloped.
6. During the construction with high groundwater level or rainy season, when the installation of pipeline (including inspection well) is completed (but the water filling test has not been carried out), technical measures shall be taken to prevent the well from floating
Material: High-density polyethylene (HDPE)
Process: one-shot injection molding
Color: Black Well
Wall thickness: 7mm
Service life:> 50 years
Product structure: high strength and toughness
Connection method: rubber ring
Instructions for use: building community, municipal drainage
Introduction
The inspection well is set up for the maintenance of power supply, water supply, drainage, sewage, communication, cable TV, gas pipe, street lamp line, etc. of urban underground infrastructure, which is convenient for installation. Generally, it is set at the intersection of pipes, turning, change of pipe diameter or gradient, and every certain distance on the straight pipe section to facilitate the regular inspection of auxiliary structures.
The plastic inspection well is composed of well seat, well bore, well cover and plastic inspection well parts. Underground drainage pipes can be used for inspection shaft, such as PVC-U double-layer axial hollow pipe, HDPE hollow winding pipe, etc.
According to the number and angle of connecting pipes, there are initial well seat, through well seat, three-way well seat, four-way well seat, 90 degree elbow well seat, etc. In order to adapt to various drainage conditions, the plastic inspection well is equipped with internal and external diameter conversion joint, saddle joint, reducer joint, convergence joint, variable angle joint, etc. These spare parts and well seat are used together to guarantee the fluidity and sealing of the whole drainage system.
Scope of application
1) Plastic drainage inspection well projects for buried drainage pipes with an outer diameter of no more than 1200 mm and buried depths of no more than 8 m in the construction area (residential area, public building area, factory area, etc.), urban and rural municipalities, industrial parks, and old city reconstruction. Design, construction and maintenance.
2) Plastic drainage inspection well construction under general soil, soft soil, seasonal frozen soil and collapsible loess soil conditions;
3) Earthquake-resistant areas with a crack resistance of 9 degrees or less.
4) The ground load of the general lane is based on the total vehicle weight of 15t (back wheel pressure 5t); the ground load of the fire lane is designed based on the total vehicle weight of 30t (back wheel pressure 6t).
5) The groundwater level is designed to be no higher than 1.0m below the ground;
Contact Us
- Beijing Tianhe Xinmai Pipeline Technology Co., Ltd.
- Contact namezuoming
Pe Pipe | Fish Cage | Plastic Inspection Well |
- FRP composite sewer manhole covers for sale
- China Grey Cast Iron Manhole Cover
- Plastic Inspection Well High Density Polyethylene Light Weight
- Impact Resistance High Density Polyethylene Plastic Inspection Shaft
- Light Weight Plastic Inspection Shaft At The Junction Of The Pipelines
- Corrosion Resistance For Industrial Park Pe Inspection Well
- Plastic Drain Well Plastic Two Way Inspection Well For Residential Area
- Impact Resistance Plastic Sewage Inspection Well High Density Polyethylene
- Pe Inspection Well Plastic Drain Well For Residential Area
- Underground Plastic Inspection Well Corrosion Resistance At The Junction Of The Pipelines
- Set At The Turning Of Pipeline Underground Plastic Inspection Well Anti Aging
- High Density Polyethylene Inspection Well Impact Resistance
- At The Junction Of The Pipelines Plastic Drain Well Black
- Corrosion Resistance Plastic Drainage Inspection Well Plastic Inspection Well
- High Density Polyethylene Plastic Underground Inspection Well Anti Aging
- Plastic Sewage Inspection Well For Residential Area Anti Aging
- Anti Aging Set At The Turning Of Pipeline Plastic Drainage Inspection Well
- For Industrial Park Plastic Inspection Shaft Anti Aging
- Impact Resistance Plastic Inspection Well Pe Inspection Well
- Plastic Drainage Inspection Well Plastic Inspection Well At The Junction Of The Pipelines
- For Residential Area Plastic Drainage Inspection Well Inspection Well
- Set At The Turning Of Pipeline Plastic Underground Inspection Well Light Weight
- Black High Density Polyethylene Plastic Inspection Shaft
- Municipal Drainage Plastic Inspection Well Plastic Sewage Inspection Well
Find Similar Products By Category
- Environment > Sewer
- Buy on GoldSupplier.com
- How to Buy
- Browse by Catagories
- Browse by Hot Regoins
- Private Sourcing Events
- Sell on GoldSupplier.com
- How to Sell
- Post Products
- Manage Products
- Manage Groups
- About
- About Us
- Link to Us
- Contact Us
- Sitemap
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
zuoming
Welcome to my shop! Glad to serve you!Please send your question!
Your message has exceeded the limit.
Your message has exceeded the limit.
-
-
Your inquiry content must be between 20 to 5000 characters.Send Now.
-
Please input the mailbox.
-