Home > Products > Mud pump drilling > BW250 Triplex Mud Pump|Drilling Pump
BW250 Triplex Mud Pump|Drilling Pump
- 50 Piece / Pieces per Month
- shanghai
- T/T L/C
- 5 days
Product Details
Brand Name: | zhongtuo | Place of Origin: | China | After-sales Service Provided: | Engineers available to service machinery overseas |
Warranty: | 1年 | Weight: | 600KG | Certification: | SGS |
Condition: | New |
Product Description
Description of BW250 Triplex Mud Pump|drilling pump
BW250 Triplex Mud Pump:
Be sure that the pump foundation is level and able to support the weight of the pump.
2. Install the pump as close as possible to the mud tank or pit to reduce drop in suction line.
SUCTION SYSTEM
The diameter of the suction line must be equal to or exceed the diameter of the pump suction connection.
Use as short a suction line as possible.
3. Install the suction line in as straight a line possible. If turns are necessary use long radius ells. 4. Install a section hose in the suction line to isolate vibration.
5. Be sure there are no air traps or air leaks in the suction line.
6. Install a charging pump in the suction line. (See CHARGING PUMPS.)
7. Install a suction desurger to prevent mud cavitation. (Refer to FLUID END ACCESSORIES in Section 4 of this guide.)
8. Fully open all valves in the suction line before operating the pump.
Tips for PREPARATION:
If the pump was not completely assembled at the factory, complete the assembly as required.
2. Check to be sure the suction and discharge systems have been properly installed. (SEE INSTALLATION)
3. Remove the cover plates from the power end.
4. Inspect the power end for contamination. Clean as required.
5. Drain all condensation from the power frame (Figure 1-4). Fig. 1-4 Power end drain plug Do not attempt to drain condensation from power frame if unit has been filled with lubricant. (why?)
6. Install cover plates.
7. Check that crankcase drain plug is installed and tight. 8. Fill the power end with correct lubricant.
Contact Us
- Shaanxi Zhongtuo Mine Equipment Co.,Ltd
- Contact nameJessie hu
- Phone86-029-62322708
- AddressNo.27, Beichen Village Industrial Park, Weiyang District, Shaanxi Province Xi'an,Shaanxi
- Cement Piston Grouting Pump With One Or Two Cylinders
- Automatic colloidal grout mixer|Mixing And Grouting
- Automatic Feeding Shotcreting Machine|Factory Price In Promotion
- Pz-5 Dry-Mix Gunite Machine
- ROTARY PERCUSSIVE DRILLING (DOWN-THE-HOLE HAMMER)
- Intelligent Grouting Machine|Mixing And Grouting
- Electric Rebar Bender|Auto
- BW250 Mud Pump|Triplex Mud Pump
- WGJ-U Steel Bracket Bending Machine For Mining
- Cement mortar spraying machine|Automatic wet
- Grouting And Shotcreting Pump
- Hydraulic Stressing Jack|Multi Strand
Popular Searches
- Spraying Machine
- Putty Sprayer
- cement mortar spray machine
- mortar spray machine
- Putty Machine
- Spraying Equipment
- mortar sprayer
- Mortar Plastering Machine
- Texture Sprayer
- graco airless paint sprayer
- wagner airless paint sprayer
- titan airless paint sprayer
- wall spray paint machine
- electric paint sprayer
- spray paint sprayer
- spraying machine plasters
Find Similar Products By Category
- Machinery > Engineering & Construction Machinery > Mortar Spray Machines
- Buy on GoldSupplier.com
- How to Buy
- Browse by Catagories
- Browse by Hot Regoins
- Private Sourcing Events
- Sell on GoldSupplier.com
- How to Sell
- Post Products
- Manage Products
- Manage Groups
- About
- About Us
- Link to Us
- Contact Us
- Sitemap
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Jessie hu
Welcome to my shop! Glad to serve you!Please send your question!
Your message has exceeded the limit.
Your message has exceeded the limit.
-
-
Your inquiry content must be between 20 to 5000 characters.Send Now.
-
Please input the mailbox.
-